正在查看旧版本。 查看 当前版本.

与当前比较 查看页面历史记录

版本 1 当前 »

1.Grid Details

You can view all grid data.
Terminate: This button is only displayed for grids with the status [Running]. Click the second pop-up window to confirm. After confirmation, the running grid will be terminated and all positions will be closed at the market price.

Details: Click to enter the grid details page to view the grid's positions, orders and transaction records.

2. Contract grid entry configuration

PC:

In the spot background-announcement configuration-brand configuration, the location is as shown in the figure. After clicking Add, click Add in the pop-up window, and configure the link and image of the contract grid in the Add menu.
Configuration link example:
Chinese: http://futures.dw2nn.com/zh_CN/futuresGrid
English: http://futures.dw2nn.com/en_CN/futuresGrid
Note: You need to replace dw2nn.com in the above address with the exchange domain name.

APP:

APP homepage King Kong position
As shown in the figure below, in Add Function Group-Access Path select Contract Trading-Contract Grid.


  • 无标签